⛛

Directional Drilling — Landing Projection

Minimum Curvature Method

Survey & TD Inputs

Units
Last Actual Survey
ft
deg
deg
D&I Sensor
ft
ft
ft
Projected Last Survey
ft
deg
deg
TD Specification
38224022
deg
deg

Projection Results

Bit → Proj Survey
Bit Depth → Proj Last Survey
— ft
Bit → TD
Bit Depth → Projected TD
— ft
Station Depth
(ft)
Inc
(deg)
Azi
(deg)
Build Rate
(deg/100ft)
Turn Rate
(deg/100ft)
DLS
(deg/100ft)
Footage
(ft)
Actual Survey — — — — — — —
Proj Last Survey — — — — — — —
Projection to TD — — — — — — —
< 3 deg/100ft — Low
3 – 6 deg/100ft — Moderate
> 6 deg/100ft — High